Request For Quotation

Philippine Science High School – Central Luzon Campus (PSHS-CLC) wishes to invite proponent for the Procurement for the Provision of Various Repairs at the Campus with ABC of Nine Hundred Forty-Nine Thousand Seven Hundred Two and 86/100 Pesos only in words and Php 949,702.86 in figures. SPPMP 2021-11-004

Details: PR No.2021-11-008-03
Item Description Qty
Unit
Unit Cost Supplier’s Price per Unit Supplier’s Total per Item
I. Cut, Fill and Base Course of Road
A. Going to Gym
a. Volume to be cut 392 cu.m. ₱427.43
b. Supply and Installation of Green Base Course (54m x 8m x 0.1m) (including compaction) 43.2 cu.m. ₱1,852.19

B. Going to SLRC
a. Compaction of existing soil 432 sqm ₱81.41

b. Supply and Installation of Green Base Course (54m x 8m x 0.1m) (including compaction) 43.27 cu.m. ₱1,852.19

C. Walkway beside Admin and Acad III

a. Volume to be cut
59.50 cu.m. ₱427.43
b. Supply and Installation of Green Base Course (including compaction)
7.81 cu.m. ₱1,852.19
II. Fence
A. Removal of Fence near ASTB
a. In front of Academic Building II to Administration Building 62 m ₱305.51
b. In front of Academic Building III 13 m ₱305.51
B. Installation of Fence at side and back of ASTB (using materials from item II.A.) 55 m ₱508.84
C. Removal of Fence around Admin and SLRC 105 m ₱305.31
D. Installation of Fence inside SLRC
a. Using rib-type roofing sheet from items 1 and 2 and supply and installation coco lumber as support 288.56 sqm ₱681.85
b. Using rib-type roofing sheet from items 1 and 2 and supply and installation of GI Pipes as support 100.48 sqm ₱681.85
III. Supply and Installation of Aluminum Composite Panel at Academic Building II 9.6 lm ₱3,206.95
IV. Removal and Installation of Gypsum Board Ceiling at Function Room and 2nd Floor Female Toilet Girls' Residence Hall, Academic Building II Eaves (including painting) 62.5 sqm ₱712.38
V. Supply and Installation of Seismic Expansion Joint Cover at Girls Residence Hall (Ground-Third Floor)
a. Gasketed Floor Cover

11.81 ft. ₱1,017.69
b. Interior Wall and Ceiling (Surface Mounted Metal Wall and
Ceiling Cover) 70.85 ft. ₱915.92
c. Exterior Wall (Surface Mounted Metal Wall Cover)
31.45 ft. ₱915.92
VI. Removal and Installation of Cement Board Ceiling outside FAD Office (including painting) 1 sqm ₱1,017.69

Duration: 60 Calendar Days
Contractor must conduct site inspection/ocular visit to accurately assess the repair works
Proponent must submit Mayor’s permit, BIR Registration, DTI/SEC Registration, PhilGeps
Number, and PCAB license during submission of quotation
Proponent must conduct the repair onsite at PSHS-CLC
Proponent must submit Income/ Business Tax Return, Omnibus Sworn Statement and Performance Security after receiving the Notice of Award prior to Contract Signing
Contract price will be subject for retention
Proponent must complete the repair service within (60) sixty calendar days
Proponent must be familiar with CDC regulations and policies including gate pass (entry/exit)
Proponent must be familiar with Government Transactions

For more information, please contact the Bids and Awards Committee of PSHS-CLC: Tel no. (045) 499-0136 / (045) 499-5597 loc 202 or email us at This email address is being protected from spambots. You need JavaScript enabled to view it.

Submissions will be accepted until December 03, 2021, 9:00am at the PSHS- CLC, Lily Hill St., Clark Freeport Zone, Pampanga or through email at This email address is being protected from spambots. You need JavaScript enabled to view it.